Check P057A OBD Fault Code ReasonThe Throttle Position sensor signals the Engine Control Module as to the current position of the engine throttle valve.
The current throttle valve opening is based on the driver's input from the gas pedal.
The ECM uses the information from this sensor to help calculate fuel delivery and spark timing.
P057A Code Symptoms :
The rule of P057A code when it comes to emissions-related vehicle repair is that any modification that changes the vehicle from a certified configuration to a non-certified configuration is considered tampering: this applies to both vehicle owners and repair facilities and is, therefore, a Federal offense. Replacing a catalyst with a straight pipe is one traditional example of P057A.
Likewise, overriding the OBD system through the use of high-tech defeat devices or non-certified computer chips, for example, would also be considered tampering. The OBD system may, however, be repaired back to its original certified configuration with certified performance chips or appropriate aftermarket parts.
Diagnosis And Repairing P057A
P057A the main thing to check is to verify the operation of the VCT solenoid. You're looking for a sticking or stuck VCt solenoid valve caused by contamination. Refer to vehicle specific repair manual to perform component tests for the VCT unit.
How to fix P057A code ?
- Faulty Air Flow Meter
- Air fuel ratio (A/F) Sensor 1 Bank 1 harness is open or shorted
- Ignition misfiring
- Failures of clutch motion/travel sensors.
Circuit High Input codes like P057A are mostly caused by defective alternators that develop excessive voltages, although there may be other causes as well, such as short circuits that 'leak' current into a particular system from other, unrelated systems that work on higher voltages. Note that in the case of short circuits that leak power into a control circuit, there is likely to be other, seemingly unrelated trouble codes present along with the code(s) being investigated. Diagnosing a 'high input' code will always involve a thorough testing of the charging system as a first step, followed by measures to isolate the system from all other possible sources of power during resistance, continuity, and reference voltage tests.